Projecap

Home/Expertise/Funding/Banco do Nordeste (FNE)

Advisory for Banco do Nordeste (FNE) financing

The Constitutional Financing Fund for the Northeast (FNE), operated by Banco do Nordeste (BNB), is the main source of long-term credit for projects in the area covered by Sudene, the Northeast development agency. We advise companies, concessionaires and SPVs from eligibility through to signing.

2026 budget
BRL 52.6 billion, of which BRL 6.3 billion under FNE Proinfra
Tenor
Up to 12 years for general investment and up to 34 years for infrastructure
Grace period
Up to 4 years for general investment and up to 8 years for infrastructure
Interest
From IPCA + 3.78% to IPCA + 9.78% per year for investment
Participation
From 50% to 100% of the investment, depending on size and location
Coverage
2,074 municipalities: the Northeast and part of Minas Gerais and Espírito Santo

Rates

Reference rate in November 2026

Investment — medium-sized and large companies
IPCA + 3.78% to 9.78% per year
Water, sewage and logistics infrastructure
IPCA + 3.02% to 4.35% per year
Other infrastructure
IPCA + 5.67% to 8.15% per year
Science, technology and innovation
IPCA + 3.40% to 4.89% per year
Stand-alone working capital
IPCA + 5.67% to 12.50% per year

Assumptions — Fixed portion of the TLP — November 2026: 7.72% per year · Regional Imbalance Coefficient: 0.64 (Northeast) · Programme factor: 0.8 to 2.3, depending on purpose and size · Location factor: 0.9 in priority municipalities; 1.1 elsewhere · Timely payment bonus: 0.85 applied to the real component · Inflation: actual IPCA for the period, in the floating-rate option · Implied inflation in the fixed-rate option: 5.50% per year (CMN Vote 57/2026) · Formula: fixed TLP × coefficient × programme factor × location factor × bonus.

Rates calculated in November 2026 under the methodology of CMN Resolution 5,013/2022. The minimum assumes a priority municipality and the timely payment bonus; the maximum, other municipalities without the bonus. The rate of each operation is the one in force in the month of signing, published by Banco do Nordeste.

History

Monthly rate history

Investment — medium-sized and large companies

IPCA + 3.78% to 9.78% per year

Down this month

Compared with October 2026, the minimum rate fell 0.20 percentage points and the maximum fell 0.51 percentage points. Since July 2026, the minimum rate fell 0.13 percentage points and the maximum fell 0.33 percentage points.

Maximum rateMinimum rate

2%4%6%8%10%12%Jul 26Aug 26Sep 26Oct 26Nov 26July 2026: IPCA + 3.91% to 10.11% per yearAugust 2026: IPCA + 4.02% to 10.40% per yearSeptember 2026: IPCA + 4.06% to 10.52% per yearOctober 2026: IPCA + 3.98% to 10.29% per yearNovember 2026: IPCA + 3.78% to 9.78% per year2%4%6%8%10%12%Jul 26Aug 26Sep 26Oct 26Nov 26July 2026: IPCA + 3.91% to 10.11% per yearAugust 2026: IPCA + 4.02% to 10.40% per yearSeptember 2026: IPCA + 4.06% to 10.52% per yearOctober 2026: IPCA + 3.98% to 10.29% per yearNovember 2026: IPCA + 3.78% to 9.78% per year

November 2026: IPCA + 3.78% to 9.78% per year

Month-by-month values
MonthMinimumMaximum
November 2026IPCA + 3.78%IPCA + 9.78%
October 2026IPCA + 3.98%IPCA + 10.29%
September 2026IPCA + 4.06%IPCA + 10.52%
August 2026IPCA + 4.02%IPCA + 10.40%
July 2026IPCA + 3.91%IPCA + 10.11%

Series calculated with the fixed portion of the TLP for each month and the regional coefficient in force, under the methodology of CMN Resolution 5,013/2022. The range runs from a priority municipality with the timely payment bonus to a non-priority municipality without the bonus. The rate of each operation is the one published by Banco do Nordeste in the month of signing.

The fund

What it is and who can access it

Created by Law 7,827/1989, the FNE is managed by Banco do Nordeste under guidelines approved by the Deliberative Council of Sudene. The 2026 programme provides for BRL 52.57 billion, an increase of 11.1% over the previous year. For 2027, the estimate announced in September 2026 is BRL 60.9 billion, subject to approval by the Council.

The fund is open to private legal entities in the industrial, agro-industrial, tourism, commerce, services and infrastructure sectors, as well as consortia formed for the project. The determining criterion is the location of the project within the area covered by Sudene. The public sector is not eligible, with the exception of non-dependent state-owned companies in priority projects.

SizeAnnual gross revenue
Small-mediumAbove BRL 4.8 million up to BRL 16 million
Medium IAbove BRL 16 million up to BRL 90 million
Medium IIAbove BRL 90 million up to BRL 300 million
LargeAbove BRL 300 million

The size classification determines the programme factor, which is a component of the rate, and the limit on the fund’s participation in the investment.

Programmes

What is financed, tenors and grace periods

Programme and purposeTotal tenorGrace period
FNE Industrial — fixed and mixed investmentUp to 12 yearsUp to 4 years
FNE Industrial — structuring and high-relevance projectsUp to 15 yearsUp to 5 years
FNE Commerce and Services — fixed and mixed investmentUp to 12 yearsUp to 4 years
Health services and the health industrial complexUp to 20 yearsUp to 5 years
FNE Proinfra — highways, railways, waterways and urban mobilityUp to 34 yearsUp to 8 years
FNE Proinfra — power generation and transmission, ports and airportsUp to 24 yearsUp to 8 years
FNE Proinfra — power distributionUp to 20 yearsUp to 8 years
FNE Verde — sanitation and infrastructureUp to 34 yearsUp to 8 years
FNE Verde — utility-scale renewable generationUp to 24 yearsUp to 8 years
FNE Verde — green hydrogenUp to 20 yearsUp to 5 years
FNE Innovation — fixed or mixed investmentUp to 15 yearsUp to 5 years
FNE Proatur — accommodationUp to 20 yearsUp to 5 years
Stand-alone working capitalUp to 36 monthsUp to 12 months

Tenors from the FNE Programme 2026, including the grace period. In projects originating from public auctions, the tenor is limited to the term of the concession. Working capital associated with the investment may reach one third of the total financed. Financial charges, debt repayment, acquisition of land and buildings, with some exceptions, and imported goods with a domestic equivalent are not eligible.

Interest

How the rate is formed

Interest on non-rural operations of the constitutional funds follows the Constitutional Funds Interest Rate (TFC), set by CMN Resolution 5,013/2022. The rate combines inflation adjustment — the IPCA consumer price index in the floating-rate option, or implied inflation in the fixed-rate option — with a real component derived from the fixed portion of the TLP, BNDES’s long-term rate, set at signing and maintained until the end of the operation.

This real component is multiplied by four factors: the Regional Imbalance Coefficient (CDR), set at 0.64 for the Northeast; the programme factor, which varies with the size of the borrower and the purpose; the location factor, of 0.9 in priority municipalities and 1.1 elsewhere; and the timely payment bonus, of 0.85 for instalments paid by the due date.

The regional coefficient reduces the real component of the interest by more than one third in relation to the Centre-West, which explains the difference in cost between the funds. With the fixed portion of the TLP for November 2026, of 7.72% per year, the resulting real component for investment by medium-sized and large companies ranges from 3.78% to 9.78% per year, plus the variation in the IPCA, depending on size, location and timely payment.

Purpose and sizeProgramme factor
Investment — revenue from BRL 4.8 million to BRL 90 million1.0
Investment — revenue from BRL 90 million to BRL 300 million1.5
Investment — revenue above BRL 300 million1.8
Water, sewage and logistics infrastructure0.8
Other infrastructure1.5
Science, technology and innovation — above BRL 1 million0.9
Stand-alone working capital — revenue above BRL 300 million2.3

Programme factors from the FNE Programme 2026. The timely payment bonus reduces the real component of the interest by 15%, not the total rate.

Limits and security

How much can be financed

The fund’s participation in the total investment varies with the size of the borrower and the classification of the municipality. For medium-sized companies, it ranges from 70% to 95%. For large companies, from 50% to 80%, with the higher percentages reserved for priority projects and for low-income and semi-arid municipalities. Projects aligned with the Ecological Transformation Plan and with the New Industry Brazil policy may reach 100%, except in power generation, transmission and distribution.

The limit per borrower is 1% of the fund’s net equity per company and 1.5% per economic group, rising to 3% in strategic projects. Accepted security includes personal or corporate guarantees, fiduciary assignment of movable and immovable assets, mortgages, pledges of machinery, receivables and accounts, and bank guarantees.

How Projecap works

From eligibility to signing

01

Eligibility assessment

Verification of the applicable programme, the borrower’s size, the classification of the municipality and the participation limit, with an estimate of the conditions.

02

Project and financial model

Preparation of the project in the format required by the bank, with the financial model, the sources and uses statement and the physical-financial schedule.

03

Security package

Definition of a security structure compatible with the project and with the bank’s credit policy.

04

Filing and information requests

Submission of the proposal, responses to requests from the technical and credit teams and follow-up through to approval.

05

Signing and disbursements

Support with formalisation, registration of security and evidence of milestones for the release of funds.

Frequently asked questions

Common questions

Can a large company use the FNE?

Yes. Companies with annual gross revenue above BRL 300 million are classified as large, with fund participation of between 50% and 80% of the investment, rising to 100% in projects aligned with the Ecological Transformation Plan and the New Industry Brazil policy.

Does the FNE finance working capital?

Yes. Working capital may be associated with the investment, up to one third of the total financed, or stand-alone, with a tenor of up to 36 months and ceilings defined by size and location.

What is the tenor for infrastructure concessions and PPPs?

Under FNE Proinfra, up to 34 years, with a grace period of up to 8, for highways, railways, waterways and urban mobility, and up to 24 years for generation, transmission, ports and airports. In projects originating from auctions, the tenor is limited to the term of the concession.

How does the timely payment bonus work?

When the instalment is paid by the due date, a factor of 0.85 is applied to the real component of the interest, equivalent to a 15% reduction in that component. In the event of late payment, the factor is 1.00.

Does the company need to be based in the Northeast?

The requirement is that the financed project be located in the area covered by Sudene, which comprises the nine states of the Northeast and municipalities in the north of Minas Gerais and Espírito Santo.

Can the FNE be combined with the Sudene tax incentives?

Yes. They are distinct and complementary instruments: the FNE finances the implementation of the project, and the incentive reduces corporate income tax on operating profit once the project is in operation.

Contact

Talk to us about your project

The initial eligibility assessment is based on the basic information about the project. You can reach us through our direct channels or the contact form.

Sources and updates

Content updated in November 2026. Rates, limits and terms are set by the lenders and the competent authorities and may change; the conditions applicable to each transaction depend on the analysis of the project.