The Constitutional Financing Fund for the Centre-West (FCO) is managed by Banco do Brasil and serves projects in Goiás, Mato Grosso, Mato Grosso do Sul and the Federal District. We advise the borrower from the consultation letter through to signing.

2026 budget
BRL 15.6 billion, with 30% allocated to FCO Empresarial at Banco do Brasil
Tenor
Up to 12 years; up to 15 or 20 years for infrastructure
Grace period
Up to 3 years; up to 5 years for infrastructure
Interest
From IPCA + 5.91% to IPCA + 15.29% per year for investment
Limit per borrower
BRL 20 million per year; up to BRL 100 million in exceptional cases
Consultation letter
Mandatory from BRL 500 thousand

Rates

Reference rate in November 2026

Investment — medium-sized and large companies
IPCA + 5.91% to 15.29% per year
Water, sewage and logistics infrastructure
IPCA + 4.72% to 6.79% per year
Other infrastructure
IPCA + 8.86% to 12.74% per year
Science, technology and innovation
IPCA + 5.32% to 7.64% per year
Stand-alone working capital
IPCA + 8.86% to 19.53% per year

Assumptions — Fixed portion of the TLP — November 2026: 7.72% per year · Regional Imbalance Coefficient: 1.00 (Centre-West) · Programme factor: 0.8 to 2.3, depending on purpose and size · Location factor: 0.9 in priority municipalities; 1.1 elsewhere · Timely payment bonus: 0.85 applied to the real component · Inflation: actual IPCA for the period, in the floating-rate option · Implied inflation in the fixed-rate option: 5.50% per year (CMN Vote 57/2026) · Formula: fixed TLP × coefficient × programme factor × location factor × bonus.

Rates calculated in November 2026 under the methodology of CMN Resolution 5,013/2022. The minimum assumes a priority municipality and the timely payment bonus; the maximum, other municipalities without the bonus. The fixed rates published in the fund’s programme are shown in the interest table on this page.

History

Monthly rate history

Investment — medium-sized and large companies

IPCA + 5.91% to 15.29% per year

Down this month

Compared with October 2026, the minimum rate fell 0.30 percentage points and the maximum fell 0.79 percentage points. Since July 2026, the minimum rate fell 0.19 percentage points and the maximum fell 0.51 percentage points.

Maximum rateMinimum rate

5%8%10%13%15%18%Jul 26Aug 26Sep 26Oct 26Nov 26July 2026: IPCA + 6.10% to 15.80% per yearAugust 2026: IPCA + 6.28% to 16.26% per yearSeptember 2026: IPCA + 6.35% to 16.43% per yearOctober 2026: IPCA + 6.21% to 16.08% per yearNovember 2026: IPCA + 5.91% to 15.29% per year5%8%10%13%15%18%Jul 26Aug 26Sep 26Oct 26Nov 26July 2026: IPCA + 6.10% to 15.80% per yearAugust 2026: IPCA + 6.28% to 16.26% per yearSeptember 2026: IPCA + 6.35% to 16.43% per yearOctober 2026: IPCA + 6.21% to 16.08% per yearNovember 2026: IPCA + 5.91% to 15.29% per year

November 2026: IPCA + 5.91% to 15.29% per year

Month-by-month values
MonthMinimumMaximum
November 2026IPCA + 5.91%IPCA + 15.29%
October 2026IPCA + 6.21%IPCA + 16.08%
September 2026IPCA + 6.35%IPCA + 16.43%
August 2026IPCA + 6.28%IPCA + 16.26%
July 2026IPCA + 6.10%IPCA + 15.80%

Series calculated with the fixed portion of the TLP for each month and the regional coefficient in force, under the methodology of CMN Resolution 5,013/2022. The range runs from a priority municipality with the timely payment bonus to a non-priority municipality without the bonus. The rate of each operation is the one published by Banco do Brasil in the month of signing.

The fund

What it is and who can access it

The 2026 programme, approved by the Deliberative Council of Sudeco, the Centre-West development agency, provides for BRL 15.63 billion, distributed between Goiás and Mato Grosso, with 33% each, Mato Grosso do Sul, with 24%, and the Federal District, with 10%. Banco do Brasil serves borrowers of all sizes. Accredited on-lending institutions — among them BRB, BRDE, Sicoob, Sicredi, Goiás Fomento and MT Fomento — serve borrowers up to the small-medium size, so that medium-sized and large companies deal directly with Banco do Brasil.

Private legal entities are eligible and, on the infrastructure line, also non-dependent state-owned companies and public-private partnerships. Holding companies are not eligible; direct financing of their subsidiaries is permitted.

SizeAnnual gross revenue
Small-mediumAbove BRL 4.8 million up to BRL 16 million
Medium IAbove BRL 16 million up to BRL 90 million
Medium IIAbove BRL 90 million up to BRL 300 million
LargeAbove BRL 300 million

Credit lines

What is financed, tenors and grace periods

LineTotal tenorGrace period
Industrial Development — industry, agro-industry and miningUp to 12 yearsUp to 3 years
Economic Infrastructure — transport, water and sewage, waste, gas, logistics, telecommunications and energyUp to 15 years; up to 20 in strategic projectsUp to 5 years
Regional Tourism DevelopmentUp to 12 years; accommodation up to 20Up to 3 years; up to 5 for accommodation
Commerce and ServicesUp to 12 yearsUp to 3 years
Science, Technology and InnovationUp to 15 years; up to 20 in strategic projectsUp to 5 years
Stand-alone working capitalUp to 24 months; up to 48 on the industrial lineUp to 6 months

Tenors from the FCO Programme 2026. Associated working capital may reach 30% of the amount financed. Undeveloped land, completed units, debts incurred before the filing of the consultation letter and goods or services supplied by a company with the same shareholders are not eligible; the latter are accepted only as the borrower’s own contribution.

Interest

Fixed rates published in the 2026 programme

The FCO follows the same methodology as the other constitutional funds. As the Regional Imbalance Coefficient for the Centre-West is 1.00, the real component of the interest is not reduced on regional grounds, which makes the rate higher than that of the FNE and the FNO for the same borrower size. The programme publishes the resulting fixed rates.

Purpose and sizePriority municipalitiesOther municipalities
Investment — small and small-medium11.94% to 13.08%13.37% to 14.76%
Investment — medium I and medium II15.16% to 16.87%17.31% to 19.39%
Investment — large17.09% to 19.14%19.67% to 22.17%
Water, sewage and logistics infrastructure10.65% to 11.56%11.80% to 12.91%
Other infrastructure15.16% to 16.87%17.31% to 19.39%
Science, technology and innovation — above BRL 1 million11.30% to 12.32%12.58% to 13.83%

Fixed rates per year, in Brazilian reais, from the FCO Programme 2026, September 2026 edition. In each band, the lower figure includes the timely payment bonus and the higher figure is the rate without the bonus. The rates are updated periodically.

Limits

How much can be financed

The fund’s participation ranges from 60% to 80% of the investment for medium II and large companies, and from 70% to 100% for medium I companies, depending on location. Maximum annual assistance per borrower or economic group is BRL 20 million, with up to BRL 100 million permitted in exceptional cases of high relevance. Maximum indebtedness with the fund is BRL 100 million, or BRL 400 million in exceptional cases.

Proposals with fund participation of BRL 10 million or more are also reviewed by Sudeco and by the state government, and the consultation letter must describe the social commitments of the project.

Process

Steps to signing

01

Consultation letter

Completion of the electronic form, with the applicant’s details, the location, the investments, projected revenues for five years and expected jobs. It is mandatory from BRL 500 thousand.

02

Bank opinion

Opinion of the branch and of the regional office of Banco do Brasil.

03

Decision of the state council

Review by the state’s Economic Development Council, which meets at least every 30 days.

04

Project and credit analysis

Submission of the project and analysis by the bank. The contracted amount may exceed the amount approved in the consultation letter by up to 10%.

05

Signing and disbursement

Formalisation and release of funds according to the project schedule.

An approved consultation letter is valid for 360 days and may be revalidated for 180 days up to twice. Projecap prepares the consultation letter and the project, structures the financial model and handles information requests at every stage.

Frequently asked questions

Common questions

What is the maximum amount per company?

BRL 20 million per year per borrower or economic group, rising to BRL 100 million in exceptional projects of high relevance. Total indebtedness with the fund is limited to BRL 100 million, or BRL 400 million in exceptional cases.

Is the consultation letter always required?

It is mandatory from BRL 500 thousand, for any amount on the science, technology and innovation line, and from the third proposal within twelve months.

Does the FCO finance working capital?

Yes. Associated with the investment, up to 30% of the amount financed, or stand-alone, with a ceiling of BRL 2.0 million to BRL 2.5 million for medium-sized and large companies.

What is the tenor for infrastructure?

Up to 15 years, with a grace period of up to 5, rising to 20 years in justified strategic projects.

Why is the FCO rate higher than those of the FNE and the FNO?

Because the coefficient that reduces the real component of the interest reflects the income of the region relative to the national average. In the Centre-West, the coefficient is 1.00; in the Northeast, 0.64; in the North, 0.68.

Contact

Talk to us about your project

The initial eligibility assessment is based on the basic information about the project. You can reach us through our direct channels or the contact form.

Sources and updates

Content updated in November 2026. Rates, limits and terms are set by the lenders and the competent authorities and may change; the conditions applicable to each transaction depend on the analysis of the project.